Building Progress September 2012

Update on building progress during September 2012…

The end of days approach (at least in terms of this stage of the conversion)…

The utility room is now completed. Painted, shelved and ready for storage. I’ve also all but finished the high level kitchen shelving, just a small ‘decorative’ detail to add to the supports at either end of the shelf to cover up the new wood brackets with some of the reclaimed timber.

I’ve also progressed with the flue guard that I’ve been building from various perforated steel sheets, solid lengths of aluminium and a resin based adhesive. It’s been slow going as I only stick one or two pieces at a time, then allow the joints 24+ hours to dry before moving on. But it’s pretty much there now, definitely finished in October.

Other jobs this month have mainly been concerned with tidying things up, getting ready for a building control visit in early October and the fast approaching onset of winter. So I’ve tidied the yard / sorted out firewood, repainted the wall behind the stove that was looking a little mucky, filled various holes in various walls and finished & filled little pieces of trim & gaps on and around the stairs and gallery landing.

Building Progress August 2012

Update on building progress during August 2012…

Shelving and lime mortar dominated August.

In the utility room, work continued installing shelving, using wood reclaimed from the animal stalls that once occupied the current kitchen. Using the same materials, I also built a wide high-level shelf in the kitchen that runs level with of the top of the kitchen cupboards and hides the slightly off centre vent pipe for the kitchen extractor fan and provides some more much needed storage.

I’ve also tidied up around the foot of the external walls, filling any small gaps that remained in the pointing or in the join between the wall and path. I also needed to rebuild the thick mortar foot of the whitewashed gable-end wall. The mortar footing hides the cable that runs from the satellite dish into the barn. The whitewashed gable-end really catches the weather and with two window sills dripping onto the footing it had crumbled over the last couple of years. So I rebuilt it using a stronger lime mortar mix – TWICE! The first attempt got washed away in places, despite being covered, by the soggy summer.

Building reclaimed wood shelving

The recently painted utility room has always been bereft of shelves. All the paint tins, barrels of tile cleaner and bottles of white spirit had no proper home and so gathered in those little used corners of the barn instead. Something had to change. Propelled by the freshly painted utility room and the poor weather I started on some new utility room shelving.

When we bought it, the end of the barn that now houses the kitchen housed chickens. The chickens resided in some rather nicely built animal stalls, that had been constructed from hard wood that I suspect had a previously life in more impressive surroundings – a school room or chapel would be my guess. I saved most of the wood from the stalls, some has been used on the front of my big metal shed and I saved one of the long beams, to use for shelving…

I took the opportunity of shelving the utility room to provide a proof-of-concept for my kitchen plans…

The shelves are simply constructed from white painted horizontal timbers screwed to the side walls. On these I sit plank shelves and then using dowels sunk into the side timbers fix on a decorative front. The front is a piece that I’ve cut out from my old beam, planned and sanded.

I’m really pleased with the eventual finish – cheap and effective, the old wood is lovely, with great colour, real ‘depth’ and it’s own story to tell. I really get a kick from using reclaimed materials such as these. Did I ever tell you about my flag stones…?

From Barn Conversion 2012
From Barn Conversion 2012
From Barn Conversion 2012