Cabin bed build ~ part 3, finishing touches

Category: Barn Conversion Journal January 19th, 2012 by mbc

Continued from Part 1 & Part 2

With the main structure safe and solid it was time to add some finishing touches.

I’d wanted the bed to have it’s own lighting so went for LED strip lights from the ‘large blue Swedish chain store’. Two packs of four lights for a total of eight provided ample to surround the bed on three sides. The LED’s were hidden behind boards attached horizontally around the bed a metre or so up from the mattress level. Some extra smaller diameter bars of wood were attached to tidy things up, along the top of the short sides and along the bottom of the back. All of these parts were screwed and / or glued into place.

Some finishing around the opening into the bed was necessary, so I used my favoured coach bolts to attach a horizontal board along the front of the bed above the cupboards to fill the gap between the front top-edge of the bed and the mattress. This will be the ‘landing-area’ when climbing up onto the bed and so needs to be sturdy and hard wearing. I also fixed an additional upright to each side of the opening mainly to hide the end of the boards that cover the lighting.

From Barn Conversion 2012

There is a hole in the plasterboard of the wall along the long side of the bed, where I’d cut through to give me access to the masonry of the real wall in order to drill through to get the TV aerial into the barn. I filled the hole and then used some oak boards that were left over from the floor to cover both ends of the wall along the long side of the bed. As this was to be a pirate cabin bed, I used this boarding to accommodate a couple of eBay purchases – a small ships wheel and a port hole (where did we buy such things before eBay came along?!). A couple of skull-and-cross-bone flags and the pirate pact was made…

From Barn Conversion 2012

I boarded-in the end between the bed and the thermal store with some ply. A high shelf to the top right and a lower shelf in the middle of the end board to the left, then door knobs drilled and screwed on the cupboards doors and the job was pretty well done.

From Barn Conversion 2012

I’m currently working on Sketchup plans of the bed and will publish those shortly.

If you enjoyed that post, then read these…

Oak Beams? ~ You must be barking!
When working through the detailed design for the barn we decided to use oak beams to support the first floor rather than steels.

category: ‘Barn Conversion Journal

Building Progress ~ October 2010
Seems like I’ve been repointing for ever and ever.

category: ‘Barn Conversion Journal

Building Progress ~ October 2011
In like a bullet this month, no messing about.

tag: ‘carpentry

Posted in Barn Conversion Journal | No Comments » « Leave Yours
Tags: , , ,

Leave a Comment

Please note: Comment moderation is enabled and may delay your comment. There is no need to resubmit your comment.