Before #5… Second Bedroom, phase 2

Category: Barn Conversion Journal October 28th, 2011 by mbc

I’ve posted before and after pictures for the second bedroom previously, but I’m considering the boxing-in of the water tank and building of a cabin bed as a second phase of development in its own right.

From Barn Conversion 2011
From Barn Conversion 2011

I’m afraid that it’s pretty messy in there as it’s still being used as a dumping ground. The cabin bed will run along the length of wall shown in the second photograph with wardrobe doors on the left to allow access to the tank then the entrance to the bed to the right of that, about where the chequered throw covered box is now. As you can see, the header tank that sits above the door and the poor positioning of the roof-light in relation to the main tank are going to make boxing in tidily very challenging…

If you enjoyed that post, then read these…

Pipes
Now we have pipes (and lots of them as well).

tag: ‘photograph

Travertine tiling – pictures
As promised on my update for July, here are some early pictures of the downstairs tiling as it goes in.

category: ‘Barn Conversion Journal

Cornwall 2011
We spent a week down in Cornwall at the start of September and there was me snapping photo’s of old bits of stone as usual.

tag: ‘photograph

Posted in Barn Conversion Journal | 1 Comment » « Leave Yours
Tags: , ,

One Response

  1. Cabin bed – plans | my barn conversion Says:

    […] is a much more involved job than my simple shelves. As I’ve previously described it “The cabin bed will run along the length of wall … with wardrobe doors on the left to […]

Leave a Comment

Please note: Comment moderation is enabled and may delay your comment. There is no need to resubmit your comment.