Building Progress ~ January 2011

Category: Barn Conversion Journal February 18th, 2011 by mbc

A new year and back to my old tricks of being very late with updates. In my defence I’ve already mentioned that I’ve been working on the drainage and tidying up the back of the barn though my great wall which has occupied much of my time over the month. A ton and a half of stone later and we’re getting there, although I’ll need to continue around the back off the barn with the tidying up.

I also made a start in putting in a low retaining wall to the garden side of the path that leads from the back door through the gap in the wall that I sweated to create three and a half years ago (time flies!). More details on that in shortly…

A little bit of tinkering around inside, filing gaps and generally tidying things up and that’s February done…

If you enjoyed that post, then read these…

Building Progress ~ January 2008, week 1, 2 and 3
Progress has really slowed as my builder is away on holiday and left his boys finishing off another job at the start of the month.

category: ‘Barn Conversion Journal

Building Progress ~ December 2010
Happy New Year – 2011! Snow disrupted things in mid-late December with a fall on the 17th of December staying with us until just after Christmas – so between that and…

tag: ‘garden tag: ‘Progress

Building Progress ~ February 2011
I completed the retaining great wall at the end of the path at the back of the barn and got on with putting in a mortared masonary wall to the…

category: ‘Barn Conversion Journal

Posted in Barn Conversion Journal | No Comments » « Leave Yours
Tags: , ,