Got a conversion to do? Building project? Got questions? Need Answers? Offering a product or service? Visit our forum.

Custom Search

rss feed rss feed rss feed

Building Progress ~ January 2011

Category: Barn Conversion Journal February 18th, 2011 by mbc

A new year and back to my old tricks of being very late with updates. In my defence I’ve already mentioned that I’ve been working on the drainage and tidying up the back of the barn though my great wall which has occupied much of my time over the month. A ton and a half of stone later and we’re getting there, although I’ll need to continue around the back off the barn with the tidying up.

I also made a start in putting in a low retaining wall to the garden side of the path that leads from the back door through the gap in the wall that I sweated to create three and a half years ago (time flies!). More details on that in shortly…

A little bit of tinkering around inside, filing gaps and generally tidying things up and that’s February done…

If you enjoyed that post, then read these…

Building Progress ~ November 2008
So apparently stoves are like hens teeth these days, demand for them has rocketed in line with spiralling fuel bills.

tag: ‘Progress

Design Patterns ~ my choices ~ update
Way back at the end of 2007 I selected a number design patterns from Christopher Alexander’s excellent ‘A Pattern Language – Towns Buildings Construction’ to guide the design of the conversion…

tag: ‘Progress

Brittany 2010
Back at the start of September we spent a week in a chalet on an estuary in Brittany.

category: ‘Barn Conversion Journal

Posted in Barn Conversion Journal | No Comments » « Leave Yours
Tags: , ,

Leave a Comment

Please note: Comment moderation is enabled and may delay your comment. There is no need to resubmit your comment.