Pipes
Now we have pipes (and lots of them as well). In addition to lots of electricity cables, we now have complex pipe-work that will form the basis of the even more complex heating and hot-water system that we’ll be installing. This also means that first-fix electrics and plumbing is now complete… (worthy of a small cheer…)

The pipework to/from the hot-water store (not installed yet!)