Things are moving along at a pace now as the first floor is in and the upstairs partitions are about to go in. We have had a couple of challenges in positioning both the walls and velux windows as the plans don’t completely line up with the actual dimensions and the windows hadn’t been positioned on the plans with reference to the A-frames and so have had to be repositioned slightly.
Now if only I could decide on the heating system!
(and bathroom fittings and lighting and plumbing … )
If you enjoyed that post, then read these...
Going Green on March 11th, 2007
We never really had any great green aspirations when we started out on this project.
No Stalling on May 6th, 2007
The old cow or chicken shed that is to be our new kitchen was furnished with three wood framed loose-boxes.
Cables on April 17th, 2008
Beautiful things electrical cables.
Heating & Hot Water - a solution? on March 28th, 2008
From the start of this project, I've been through numerous options regarding the method by which we'll heat the barn and generate hot water for domestic purposes.
Building Progress ~ December 2007, week 1 and 2 on December 17th, 2007
The first of the structural elements that will form a finished part of the building have been installed.
Posted in Journal of my barn conversion |